Lube-Tips Newsletter
           

Free Subscription to Practicing Oil Analysis
Practicing Oil Analysis

 

Free Subscription to Reliable Plant
Reliable Plant

 

Readers Challenge    January 14, 2004

Is Turbine Flush Justified?

Spencer Anderson, PDM Tech, TLNA A.E. Staley

My recommendations would be the same as the Plant Maintenance. The total system needs to flushed thoroughly and also All lines removed, blown out with air, and cleaned. It would also be a good idea to remove the top bearing caps and inspect For any Babbitt wear. If this is wet lubrication system for the bearings, make sure all piping going to and from the bearings Are secure.

With a few more weeks remaining in the shutdown, this should be more than enough time to thoroughly flush And clean the systems before start-up.

See other responses to this Readers Challenge.

 

Every week we send Lube-Tips™ to more than 48,000 subscribers. May we invite you to reserve your FREE subscription?

E-mail:

Lube-Tips
Lean Manufacturing Journal
Reliable Plant

We never share, rent
or sell e-mail addresses and use responsible e-mail practices:

Habeas Certified Sender Seal



Oil Analysis Solves Cooling Tower Problems
Oil life extended from six months to three years.

Squeeze Every Last Cent From Your Oil

Dozens of tips for extending lubricant life

How to Reduce Motor Bearing Failures
Modifying your lubrication program can improve reliability.

 

Motor Oil Selection Guide

About Lube-Tips  •  Subscribe/Unsubscribe  •  Contact Us  •  Submit Tip  •  Advertising  •  Career Opportunities

All Noria Publishing Sites
Reliable Plant - Machinery Lubrication - Practicing Oil Analysis - Reliable Plant Mail -
Filtration Tips
- Lube-Tips - Lean Manufacturing Journal


 © Copyright 2008 Noria Corporation